Home gutted to the studs with new plumbing and wiring during a gut renovation
Remodeled primary bathroom with a soaking tub, glass shower and double vanity
Remodeled open living and dining area with wood-look floors and a white fireplace wall

Whole Home Remodeling and Gut Renovations in Houston, Pearland and Galveston

Master Remodelers handles whole home remodels and full gut renovations for homes in Houston, Pearland, Friendswood, League City, Clear Lake and Galveston. In a gut renovation, we take the house down to the studs, update the plumbing, wiring and insulation, and rebuild it with a new layout, kitchen, bathrooms and finishes. One team manages the design, permits and construction, so you have one contract and one point of contact from start to finish.

Master Remodelers is a family-owned company that has been remodeling Houston-area homes since 1998. We’re licensed and insured, rated A+ by the BBB, and back our work with a lifetime workmanship warranty.

Whole Home Remodel or Gut Renovation: What's the Difference?

 

Whole home remodel

Gut renovation

What changes

Most rooms get new finishes, and some walls may move

The interior comes down to the studs and is rebuilt

Systems

Updated where needed

Plumbing, wiring, HVAC ductwork and insulation are usually replaced

Layout

Can stay the same or be partly opened up

Fully redesigned

Best for

A sound house that looks dated

An older house, a fixer-upper or a home after major water damage

 

Not sure which you need? We’ll walk the house with you and tell you honestly what’s worth keeping.

What a Whole Home Remodel Can Include

  • A new layout, such as an open kitchen and family room, a larger primary suite or a home office.
  • Kitchen remodeling with new cabinets, counters, lighting and appliances. See kitchen remodeling.
  • Bathroom remodeling, from a hall bath refresh to a new primary bath. See bathroom remodeling.
  • Flooring, trim, doors and paint throughout, so every room matches.
  • New plumbing, electrical and insulation behind the walls.
  • Windows and siding, if the outside needs work too. See window replacement and siding.
  • Design help choosing materials, colors and fixtures. See our interior design services.

 

Need more space as well? A whole home remodel can be combined with a room addition or a second story addition. For ideas, see our Texas home remodeling trends.

Signs Your Home Needs a Full Renovation

Many Houston-area homes built from the 1960s through the 1990s have problems that cosmetic updates can’t fix:

  1. Cast iron drain lines under the slab. They corrode and crack over time, which can cause slow drains, backups and leaks under the floor.
  2. Polybutylene water lines. This gray plastic pipe was common from the late 1970s to the mid-1990s and is known for failing.
  3. Outdated wiring, such as too few circuits for modern kitchens, no GFCI outlets near water, or an older electrical panel.
  4. A closed-off layout with a small kitchen and rooms that don’t fit how you live now.
  5. Flood or storm damage. After water gets into the walls, a gut renovation is often the right way to rebuild. See storm and disaster repair and mold remediation. If you’re working through an insurance claim, read our insurance claim rebuild guide.

What Affects the Cost of a Whole Home Remodel?

  1. Size of the home and how many rooms are included.
  2. How far down you go, from new finishes to a full gut to the studs.
  3. Layout changes, especially moving walls, plumbing or the kitchen.
  4. Systems, such as new plumbing, rewiring, HVAC and insulation.
  5. Finishes, from cabinets and countertops to flooring and fixtures.
  6. What’s found during demolition, such as rot, termite damage or old pipe problems.

Prices change with material and labor costs, so we price every project from your design instead of quoting a range. Your estimate is free and itemized. Ask about home improvement financing through Slice by FNBO.

Our Whole Home Remodeling Process

  1. Free consultation. We walk the house with you, talk about your goals and budget, and look for problems that would change the plan.
  2. Design. We create the layout and help you choose materials and finishes. 
  3. Permits. We pull the permits and schedule the inspections.
  4. Demolition and rough-in. We take out what’s coming out, then install the new plumbing, wiring, ductwork and insulation, and pass the rough-in inspections.
  5. Rebuild and finishes. Drywall, cabinets, counters, tile, flooring, trim, paint and fixtures. 
  6. Final walkthrough. We walk every room with you and fix anything on your list before we call the job done.

Why Choose Master Remodelers for Your Whole Home Remodel?

  • Family owned since 1998, led by President Donald “Don” Borden.
  • Experience rebuilding homes after hurricanes, floods and freezes, which is the hardest kind of whole home work.
  • One team for the whole house. See our general contractor services.
  • Licensed and insured, with an A+ BBB rating, the Pulse of the City Award in 2025 and 2026, and a lifetime workmanship warranty.

Read our customer reviews or browse the project gallery.

Frequently Asked Questions

Usually not. During a gut renovation, the kitchen and bathrooms are out of service, the water and power are shut off at times, and there's a lot of dust. Most families stay with relatives, rent a short-term place, or plan the work in sections so part of the house stays livable.

You do if the wall is load-bearing. A structural engineer decides what beam or support replaces the wall, and the city usually needs that design for the permit. Walls that don't carry weight can often come out without an engineer, but plumbing, wiring or ductwork inside them still has to be rerouted.

It's common in older homes. Demolition can uncover rot, termite damage, leaks or old wiring that couldn't be seen before. When that happens, the problem is documented with photos, and you get a written change order with the cost before the extra work is done. Setting aside 10 to 15% of your budget for surprises is a smart plan for any older house.

The new work does. Anything that's rebuilt, rewired or re-plumbed has to meet the current code and pass inspection. That often means adding things like GFCI and AFCI protection, smoke and carbon monoxide alarms, and updated venting. Parts of the house you don't touch can usually stay as they are.

Doing it all at once usually costs less overall and finishes sooner, because the crews, permits and demolition happen one time. Phases cost more in total but spread out the spending and let you stay in part of the house. If you phase it, do the plumbing and electrical work first so later phases don't mean tearing out new finishes.

Homes built before 1978 may have lead paint, and older homes can have asbestos in materials like popcorn ceilings, flooring and pipe insulation. Before demolition, suspect materials should be tested. Federal rules require contractors working on pre-1978 homes to follow the EPA's lead-safe renovation rule, and asbestos must be handled by licensed abatement professionals.

Get a Free Whole Home Remodeling Estimate

We'll visit your home, talk through your plans and give you an itemized estimate.